Saint Gobain

Location: Calarasi

Developed Area: 54,000 sqm

Start Date: August 2004

Completion Date: March 2007

Details:

Glass warehouse: metal structure; conveyor bridge systems; high profile, pleated, trapezoidal metal sheet roofing system; mineral wool and bituminous membrane; light façade with structured cassettes.

Sand warehouse: mixed structure, high profile, pleated, trapezoidal metal sheet roofing system; mineral wool and bituminous membrane; trestle Work Bridge for elevated conveyor belts; concrete silos with high profile, pleated, natural and artificial lighting system, hot gas release systems.

Administrative offices: mixed structure; green and trafficable roof tops; industrial façade with structured cassettes, mineral wool and decorative corrugated metal sheets, curtain walls and aluminium; covers, pump house and access towers made in industrial solutions of pre-painted metal sheets; Geberit type gravitational water drainage system; trapezoidal facade skylights, aluminium joinery, special design foundations in difficult terrain and supervision of execution; the whole execution part is considered special due to fittings and works done as high as 35m.

Referrals: here