Wastewater treatment plant Crivina

Location: Crivina

Developed Area: 5,000 sqm

Start Date: March 2005

Completion Date: Decembrie 2005

Details:

Trafficable rooftops supported by concrete structure with mineral wool and double layered, slate protected, bituminous membrane solution. Non trafficable rooftops: supported by trapezoidal metal sheet plating, medium profile, mineral wool and bituminous membrane; special insulations on the filters; joinery treatment; water drainage system. 

 

Referrals: here