Development center and business support Siriului

Location: Bucharest

Area: 5068.5 square

Start Date: March 2012

Completion: April 2013

features:

Office building S + P 5 E 6 retired
System Design: To execute executed excavation to a Berlin-type support with piles of concrete and metal profiles embedded.
Infrastructure: general foundation of reinforced concrete;
Superstructure: columns, beams and concrete floors. Floors are provided with post-tensioned reinforcement.
External closures: glass curtain walls with finuri and parasols, Trespa cladding, aluminum composite and thermal.
Interior: flooring technology, ceilings, glass balustrade, granite plating.
Equipment: sanitary, heavy-current and low voltage electrical, HVAC, bransamete water / sewer, gas, electric and BMS.